1. Turn the power on, the power indicator lights, and the device is powered.


2. Open the safety door and place the material that needs to be lifted in the middle of the hydraulic lifting elevator (the material requirement height should not exceed 1.8 meters, the width should not exceed 80% of the elevator width, the length should not exceed 90% of the elevator length, and the load should not exceed 20% of the rated load.


3. After the materials are placed neatly, the safety door can be closed.


4. Press the up or down button on the control panel.


5. The hydraulic lifting elevator start working.