Model:
Max. Lifting Load:
Max. Lifting Height:
Certification:
Working duty:
Customized:
Double girder gantry crane is widely used for loading, unloading, transportation in outdoor workshop, ourdoor warehouse, stock yard, railway and freight station, construction and bridhe building, harbor and more
Macx. Lifting capacity: 500 ton
Span: 10- 35 m
Max Lifting height: 12 m
Control mode: Remoted controll, Ground control or cabin control
Working duty: A5-A8
Power source: Cable or slide wire.
Gantry crane Description
The double girder gantry crane consist of Main beam, Support legs, Electric hoist with trolley, Motor, Reducer, Cabin, and other Electric parts.
The Frame crane main beam and support legs are high quality welded steel box-shape, high intensity, rigidity, stanle, and long service life. The Cantilever arms can added the working range.
The gantry crane lifting mechanism is composed by high quality electric hoist, motor, reducer, coiling block, lifting and traveling limit switch, traveling smoonthly, can emergency stop. Equip with overload protection, avoid overload damaging the hoist and gantry crane.
Motor, reducer and Electric parts adopt international brand, such as Schneider, Siemens, Chint and other to ensure accurate operation, excellent performance and convenient maintenance.
Equip with frequency converter can be supplied to meet your demand.
And, besides common hook, you also can choose other lifting tools, such as grab, electromagnetic chuck, billet clamp and container holder.
Safety protection device
1. Safety motor, three phase asynchronous motor, large load capacity, high machinery performance and low noise, with overload alarm, voltage protection and current overlead protection
2. Long life service wheels, bearings, gears, couplings and polyurethane buffer
3. Traveling, lifting limit switch
4. Overload protction
5. Electric voltage and current protection
6. Sound and light alarm
7. Weather enclosure
Packing & Delivery
Package
Electric parts and hoists are packed by plastic bubble and wooden case, Main beam and support legs are packed by strong plastic woven cloth.
Delivery
1. Within 15 working days.
2. Can transport all as users requirement.
Henan Jinrui Machinery © Co., Ltd. All Rights Reserved |